Loading...

The clash between Power BI git integration and deployment pipelines

The clash between Power BI git integration and deployment pipelines
Together with the introduction of Microsoft Fabric a long-awaited feature for Power BI also became available. Git integration now allows us to connect your workspace to a git repository to sync the meta data from your Power BI dataset and report between the workspace and the repository. At the same time, Power BI deployment pipelines …

Continue reading The clash between Power BI git integration and deployment pipelines

Published on:

Learn more
Data – Marc
Data – Marc

Blogging about everything related to Data and AI based on Microsoft technology

Share post:

Related posts

Power BI, M365 Copilot And The Importance Of DAX UDFs

This was a big week for Power BI Copilot with the announcement of a new direction for the feature. If you haven’t done so already, read ...

2 days ago

Microsoft Copilot (Microsoft 365): Power BI integration in M365 Copilot

This release enables M365 Copilot to reason over Power BI enterprise data and returns grounded answers directly from Power BI reports and sema...

8 days ago

Using Fabric Operations Agents And Workspace Monitoring With Power BI

This week, in the announcement about support for Fabric Pipelines in Workspace Monitoring, I noticed that it came with an Operations Agent tha...

10 days ago
Stay up to date with latest Microsoft Dynamics 365 and Power Platform news!
* Yes, I agree to the privacy policy