Loading...

Dynamics 365 Project Operations – Configure Maximum Daily Time Entry Duration

Dynamics 365 Project Operations – Configure Maximum Daily Time Entry Duration

We are announcing the ability to configure maximum daily time entry duration in Dynamics 365 Project Operations. This feature will reach general availability on July 24, 2026. How does this affect me? With this feature, admins can configure the maximum time that can be logged for time entry. This configuration can be applied from the Parameters page and will be checked each time a new time entry is created or modified. What action do I need to take? This message is for awareness, and no action is required. Message ID: MC1425968

The post Dynamics 365 Project Operations – Configure Maximum Daily Time Entry Duration appeared first on M365 Admin.

Published on:

Learn more
M365 Admin
M365 Admin

by João Ferreira

Share post:

Related posts

Stay up to date with latest Microsoft Dynamics 365 and Power Platform news!
* Yes, I agree to the privacy policy