Loading...

Orchestrate Power BI Semantic model refreshes through Fabric Pipelines

Orchestrate Power BI Semantic model refreshes through Fabric Pipelines
Recently, Microsoft released a new activity type to trigger Power BI Semantic Model refreshes. A great step forward to have a native pipeline activity and no longer need to setup complex steps with APIs and authentication manually. Or is there still a case? In this blog I will elaborate on what this new Pipeline activity …

Continue reading Orchestrate Power BI Semantic model refreshes through Fabric Pipelines

Published on:

Learn more
Data – Marc
Data – Marc

Blogging about everything related to Data and AI based on Microsoft technology

Share post:

Related posts

Power BI MCP Tuner Server and does it reduce capacity requirements – Part 4

This blog post is about using MCP to tune DAX and then using the Automated Load Testing does it reduce capacity. I originally did not plan for...

2 days ago

Calling DAX UDFs From Power BI Copilot

Can you call a DAX UDF from Power BI Copilot? I was asked this question by Jake Duddy during the livestream on Power BI Copilot I did with Rei...

4 days ago
Stay up to date with latest Microsoft Dynamics 365 and Power Platform news!
* Yes, I agree to the privacy policy